One-step conversion
Divide conversions by the number entering the step, then multiply by 100 for a percentage.
Conversion rate = conversions ÷ visitors or leads × 100%Work out the conversion rate of one step or your whole funnel, and see what each extra point is worth.
The number entering this step.
The number completing this step.
The rate you want to compare with your current rate.
People entering the first funnel stage.
Visitors who become leads.
Leads who become marketing qualified.
MQLs accepted as sales qualified.
SQLs that become qualified opportunities.
Opportunities that become customers.
Used to show closed-won revenue and the value of each lever.
Conversion rate
150 conversions from 5,000 starts gives a 3% conversion rate.
Divide conversions by the number entering the step, then multiply by 100 for a percentage.
Conversion rate = conversions ÷ visitors or leads × 100%Each step divides its count by the stage before it. Overall conversion divides the final stage by the first.
Step rate = current stage ÷ previous stage; overall = closed-won ÷ visitorsAdd five percentage points to one step and carry the improved count through the later stages at their current rates.
Deals gained = projected closed-won with improved step - current closed-wonDivide conversions by the number of visitors or leads, then multiply by 100. With 150 conversions from 5,000 starts, the rate is 3%. The target comparison shows how many extra conversions another point would produce at the same volume.
For each step, divide the current stage count by the previous stage count. For the whole funnel, divide closed-won deals by visitors. With the funnel defaults, seven deals from 10,000 visitors gives 0.07% overall conversion.
A step rate measures movement between two neighbouring stages. The overall rate measures the full journey from the first stage to the last. A healthy overall rate can still hide one weak step.
Start with the stage where a five-point improvement creates the most additional closed-won revenue, assuming the other rates stay unchanged. The lever cards make that comparison and mark the largest gain. Also check tracking and lead quality before changing the process.
The Pipeline Leak Audit takes ten business days.